05 Oct

Creation Experience Museum

  • Owner: Creation Museum Of The Ozarks
  • Location: Branson, MO
  • Status: Designed – Fundraising for Phases 1 and 2
  • Size: 27,000 s.f. creation science museum, including 10,000 s.f. of guided tour exhibit space, bookstore, and classrooms
  • Phase 2: 10,000 s.f. children’s interactive exhibit space
  • Future: Planetarium, Lecture Hall
  • Services performed: Preliminary Design, Master Planning, 3-D visualization & animation
03 May

Christ In Youth

Owner: Christ In Youth
Location: Joplin, Missouri
Architect: Joplin Construction Design & Management, Inc.
Status: In Progress
Size: 18,570 Sqft
Project: New Conference Center and Studio
Services Provided: Architectural Services
28 Apr

Clarinda First United Methodist Church

Owner: Clarinda First United Methodist Church
Location: Clarinda, Iowa
Architect: Joplin Construction Design & Management, Inc.
Status:In Progress
Size: 13,700 Sqft
Project: New Church Facility
Services Provided: Design/Build
28 Apr

Main Street Pet Care

Pet Care

Owner: Main Street Pet Care
Location: Joplin, Missouri
Architect:  JCDM
Status: Completed
Size: 10,173 Sqft
Project: New Veterinary Facility Remodel
Services Provided: Design/Build
25 Mar

JCDM Welcome Message

JCDM IMAGEJoplin Construction Design And Management is an innovative Design and Build company, with a reputation for swiss replica watches top-quality performance, our method of operation provides a proven management plan, with experienced personnel and systematic specially suited for each project we undertake.

24 Mar

Architectural Design Studio

West Vue Nursing

Testimonial from Architectural Design Studio

October 9, 1996

Joplin Construction Design and Management Company
P.O. Box 1604
Joplin, MO  64802

To whom it may concern:

I have been practicing Architecture for about 17 years, have done projects from houses to airport terminals, and worked with all types of contractors.  During that time, very few contractors have measured up to the caliber of Joplin Construction Company.

Joplin Construction Company was the successful bidder on West-Vue Nursing Home, in West Plains, Missouri.  Their honesty and professionalism during the pre-bid was exemplary.  Cost estimating and CPM schedules were thought out and complete.  Many hours were spent during the post-bid pre-construction period going over plans and specifications to insure a smooth running, trouble free project.  So far the time in coordination and value engineering has proven to be well spent.  The West-Vue Home project is over half complete, the hard half, and has experienced few problems.  It appears that the job will continue through completion in the same fashion.  It is hopeful that Joplin Construction Company and our office will be able to work on future projects together.

If there are questions about the project or statements in this letter do not hesitate to call.

Sincerely,

Denis R. Anderson
Vice President

24 Mar

Holy Trinity Church

Holy Trinity Catholic Church

Testimonial from Holy Trinity Church

October 30, 1996

Joplin Construction Design and Management
Attn:  Steve Smith
P.O. Box 1604
Joplin, MO  64802

Steve Smith,

I would like to commend Danny Ward for his outstanding dedication to our project.  He went to great lengths to see that not only your company’s interest was seen to, but also made sure that we the customer was satisfied.   I feel we have a quality building to be proud of that will last for generations to come.  Danny really knows his job and is very conscientious.  It was a pleasure working with Danny on almost a daily basis.  I hope that you and your company appreciates and realizes what an asset Danny is to have on your team!!

Sincerely,

Chris Ackley
Project Chairman

01 Feb

Reeves Tire & Auto, Webb City

Plumbing Bid Due Date: November 16, 2011 by 4:00 pm

All other Divisions Bid Due Date: November 22, 2011 by 4:00 AM

Architect: JCDM Inc.

Design/Builder: Joplin Construction Design & Management, Inc. 417-781-4288, www.jcdm.com

Project Manager: All bids to be faxed to replica watches uk JCDM office. Our Fax number is: (417) 781-4480 Attn: Rusty Smith

 

02 Apr

Inland Southern Corporation – 2000

  • Winner: Inland Southern Corporation – 2000
  • Joplin Construction Design & Management is hereby a distinguished member of the Inland Buildings Multi-Million Dollar club for outstanding achievement in the marketing and sales of Inland Building systems.